All places A to ZOpen the app

Kosi Mahasetu, Nirmaliकोसी महासेतु, निर्मली

The 2020 rail bridge that reconnected two halves of Mithila after 86 years.

See what is open on your dateOpen in Google Maps
WhereSupaul, Bihar
Kosi & Seemanchal
Best time to visit15 October to 15 March
Good seasonsPost-monsoon (October to November), Winter (December to February)
DifficultyEasy
Time needed1 hr
Base and nearbySaraigarh, Nirmali
EntryFree

About Kosi Mahasetu, Nirmali

The 1934 earthquake and the Kosi that followed it cut the rail link between Nirmali and Saraigarh, and for 86 years Mithila east and west of the river were joined only by long detours. The 1.9 km rail bridge opened in September 2020 and closed that gap. There is nothing to visit as such, but a train ride across it, or a look from the embankment, is a piece of north Bihar history.

What to see and do

Opening status, best time and closures here are estimates from usual seasons and past patterns, not live information. Confirm with the local authority before you go. Terms of use

More places in Supaul

All places in Supaul · All places in Bihar

Jagah Pedia home · All places A to Z · Privacy · Terms

Jagah Pedia is a free travel guide by Santosh Pandey. Status, timings and closures are estimates from usual patterns, so confirm locally before you travel.